|
Post by seanclevedongas on Jan 18, 2024 19:41:40 GMT
Him and his mate on the other wing spent all match falling to the ground, its a bit embarrassing a top Championship club had to resort to cheating to beat a mid table L1 side. You do have to wonder what other decisions also went their way, no cards for kicking the balls away, the goalie blatantly time wasting and 10 yards stolen at every thrown in were the obvious ones. The linesman on the west side missed every offside all night. Gaining advantage at throwins is rarely punished, strangely the ref gave two foul throws against us. Vale was penalised twice at Blackpool too, our throw ins are mostly appalling
|
|
|
Post by seanclevedongas on Jan 18, 2024 18:53:15 GMT
I'm a ground hopper (Reading fan too, but that's another story). I've been trying to buy a ticket online for the game on Saturday v Blackpool. It has been incredibly frustrating, with a confusing system which I believe entails signing up as a member, and then possibly signing up for something else that enables me to make online purchases. I have been down endless dead ends trying to do this. I usually get messages about not being a member, user name not recognised or password not recognised. At one point, I was sent a link to update my password which took me to a page belonging to Lincoln City! I had the same problems with them a few weeks ago - I believe they use the same ticketing software. So far, so bad. Efforts to obtain help from the club have also failed. The ticket office emailed back and asked me what game I wanted a ticket for, I replied and that was the last I heard. A guy called Pete Weymouth sounded helpful, so I emailed him, only to find that the address given on the club web site was invalid. I then emailed the manager of ticketing (name of Clare), and have not heard back from her. I'm in my mid seventies, and need to be able to sit for a game. If I just turn up on the day, am I sure to get a seat? Or will I be forced to buy a terrace standing ticket? Grateful for any advice. Welcome to our world! We have a new stand that has been granted a certificate to be half full, I am sure there will be spaces available but would suggest ringing Pirate Leisure 01179096648
|
|
|
Post by seanclevedongas on Jan 18, 2024 12:00:49 GMT
Cox 6 Grant 7 Taylor 8 Crama 7 Thomas 6 Finley 6 Evans 6 McCormick 6 Vale 4 Collins 3 Martin 4
Hunt 4 Marquis 4 Sinclair 1
Ref 0
Norwich 6
|
|
|
Post by seanclevedongas on Jan 17, 2024 14:11:46 GMT
4 available in East stand and 3 in West stand
|
|
|
Post by seanclevedongas on Jan 16, 2024 21:36:32 GMT
It's written in the clouds we're going to win! That'll be a 3-0 defeat then!
|
|
|
Post by seanclevedongas on Jan 16, 2024 20:56:15 GMT
I sense it's the cost of using it rather than the initial installation cost. How often do we really need it, once a season at most, even by Saturday it won't be required. I can't understand why nobody has invented a heated cover, basically a waterproof electric blanket! Remember the heated tent Leicester had, protected the pitch from frost and could train on pitch. May have been very expensive to generate the hot air, can’t Remember My understanding is they are rerouting the water from the urinals to the under pitch drainage channels to 'warm the pitch', so drink plenty beforehand and at halftime......
|
|
|
Post by seanclevedongas on Jan 15, 2024 20:57:07 GMT
1000 extra tickets available on the day in a stand not yet used, for a fixture which sold out in hours, what could go wrong? I’m leaving Bournemouth right now to camp outside to be one of the lucky few UTG Sorry to disappoint but there are already 3,000 queuing
|
|
|
Post by seanclevedongas on Jan 14, 2024 16:19:26 GMT
Cox 5 Connolly 6 Grant 6 Crama 5 Thomas 6 Finley 6 Evans 6 McCormick 5 Vale 4 Brown 3 Martin 5
Ward
Gibbons 4 Hoole
Hunt 5 Collins 4 Marquis 4 Sinclair
Ref 4 Barnsley 5
|
|
|
Post by seanclevedongas on Jan 14, 2024 1:13:54 GMT
X rumour that Gibbons is the next on his way out (to Oldham)
|
|
|
Post by seanclevedongas on Jan 12, 2024 22:01:49 GMT
2-0, is this a good result from our perspective? 2-1 yes I’d say it is , they’re more likely to concentrate on the league and possible playoff spot Yes up to 8th
|
|
|
Post by seanclevedongas on Jan 12, 2024 21:57:33 GMT
2-1
|
|
|
Post by seanclevedongas on Jan 12, 2024 21:56:24 GMT
2-0, is this a good result from our perspective?
|
|
|
Post by seanclevedongas on Jan 12, 2024 21:24:20 GMT
Came on at 60mins on Saturday
|
|
|
Post by seanclevedongas on Jan 12, 2024 20:58:54 GMT
Norwich currently 1-0 up at halftime
|
|
|
Post by seanclevedongas on Jan 12, 2024 17:05:27 GMT
Birmingham 1v1 Swansea Cardiff 1v3 Leeds Hu-field 2v2 Plymuff Rotherham 0v0 Stoke Barnsley 2v1 Gas Charlton 1v2 Posh Wycombe 2v1 Lincoln Accy 1v0 Gills Colchester 0v1 Bradford Morecambe 1v1 Mansfield Tranny 1v1 M K Dons Boston 2v0 Curzon
|
|
|
Post by seanclevedongas on Jan 12, 2024 12:20:50 GMT
At 12.20pm family stand (SW stand) tickets still showing as available
|
|
|
Post by seanclevedongas on Jan 11, 2024 23:32:38 GMT
|
|
|
Post by seanclevedongas on Jan 11, 2024 13:45:50 GMT
My understanding is once building work is completed. The council will sign it off. Then the club will apply for a safety licence based on the agreed capacity. This could be the full capacity. The club would then run ' test events ' based on the agreed capacity. I'm not sure were this incremental number came from. The council and the club could agree that the ' entire ' south stand could open for these experiments. The question is when will the building work finish ?. When will it be signed off ?. When will the powers agree the new capacity ?. When will the test events start ?. But once above agreed I expect the vast majority of the south stand to be open not as suggested in portions. In fact the club could ask the council for the entire capacity 12000 plus and run ' test events ' like other clubs do. I understand that the electrical works are currently taking place which includes power for facilities under the stand, floodlights on the South stand to remove the shadow on the pitch and prep for the new East stand (I understand the costs of the electrical work is in excess of £200k)
|
|
|
Post by seanclevedongas on Jan 11, 2024 9:09:00 GMT
3.15
|
|
|
Post by seanclevedongas on Jan 10, 2024 15:31:39 GMT
|
|